Notice

Stage 1 Water Watch is in effect. Outdoor watering two days a week, before 8 a.m. or after 6 p.m. Details

Home / Services / Building & developing

Apply for a new water connection

Required for new homes, ADUs with a separate meter, and commercial buildings. Includes plan check, capacity fees and meter installation.

Cost
Capacity fee from $6,840 for a 5/8-inch meter. Plan check $410.
How long it takes
Plan check in 15 business days. Meter set within 10 days of payment.

What you need

  • Site plan
  • Fixture count
  • Fire flow requirement from the fire marshal